Skip to content

New-build joineryAcross the North West

First fixto finalfix.

We win and deliver the joinery packages on new-build housing developments across the North West. Roofs, studwork, stairs, doors, skirting and kitchens, done plot by plot.

Every fix,one firm

We take the whole joinery package on a plot, in the order the house goes up. One contractor from the first truss to the last snag.

  1. Stage 1: The structure, before the plasterers

    First fix

    The joinery that goes in while the house is still a shell. It has to be right first time, because everything after it is built on top.

    • Roof trusses and bracing
    • Floor joists and decking
    • Stud partitions and noggins
    • Door linings and window boards
    • Staircases, fitted and protected
  2. Then the plasterers go in. We come back for second fix once the walls are boarded, skimmed and dry.

  3. Stage 2: The finish, once the walls are dry

    Second fix

    Everything the buyer sees and touches. Doors that close properly, clean mitres and straight lines in every room.

    • Internal doors hung, with ironmongery
    • Skirting and architrave
    • Kitchens fitted
    • Wardrobes and built-in storage
    • Boxing-in, bath panels and loft hatches
  4. Stage 3: Snagging and sign-off

    Final fix

    We come back after the decorators, work through the snag list with your site team and get the plot signed off.

    • Doors eased and adjusted after decorating
    • Site manager's snag list worked through
    • Checks before customer walk-rounds
    • Plot signed off, ready for handover
  5. Plot signed off. Keys handed over.

How a siteruns with us

From tender to handover, in seven steps.

  1. Step 1, you send

    Tender in

    Send us the drawings, house types and plot schedule for the site.

  2. Step 2, we price

    Priced

    We price the joinery package plot by plot, from first fix to final fix.

  3. Step 3, contract

    Awarded

    We agree the programme and build sequence with your site team.

  4. Step 4, on site

    Start

    Our joiners start on the first plots as soon as they are ready for us.

  5. Step 5, before plaster

    First fix

    Trusses, joists, studwork, linings and stairs, ready for the plasterers.

  6. Step 6, after plaster

    Second fix

    Doors, skirting, architrave, kitchens and wardrobes.

  7. Step 7

    Handover

    Snags cleared, plot signed off, and on to the next one.

Where'syour site?

We work on developments right across the North West. Pick a town to check, then tell us about the job.

DrawingNW-01TitleSite coverageScaleNTS

Where is your site?

Pick a town

Not on the list? Send the tender anyway. If it's in the North West, we'll look at it.

Built bypeople whobuild.

R Joyce Joinery is a North West joinery contractor working on new-build housing. We tender for the joinery package on residential developments, then deliver it on site, plot by plot.

Main contractors and housebuilders get one firm for every fix, working to their programme, and a straight answer when they ask how the plots are going.

  • One firmFirst fix to final fix, no hand-offs between joinery trades.
  • Plot by plotWe follow your build sequence and move with the programme.
  • Signed offWe are not done until your site manager is happy with the plot.
  • New-build specialists

    Housing developments are what we do. We know how a site runs and what a site manager needs from a joinery contractor.

  • Priced from your drawings

    Send us the tender pack and we price the joinery package plot by plot, so you can compare it line for line.

  • Across the North West

    Sites in Merseyside, Greater Manchester, Lancashire and Cheshire.

  • The whole package

    First, second and final fix from one firm, so there is one contact and one programme for the joinery on your site.

Build yourpackage

Tick what the joinery package needs to cover. We'll add it to your enquiry so we know exactly what to price.

First fix
Second fix
Final fix

What tosend us

The more of the tender pack we have, the tighter the price. This is what we look for.

  1. 01

    Drawings

    Site layout and the house type drawings, including any joinery details.

  2. 02

    Plot schedule

    How many of each house type, and which plots are in which phase.

  3. 03

    Specification

    Doors, ironmongery, skirting and architrave profiles, kitchens and wardrobes.

  4. 04

    Programme

    Start date, build sequence and when the first plots will be ready for us.

  5. 05

    Site address

    Where the development is, so we can plan travel and labour.

  6. 06

    Who to price back to

    The buyer or QS handling the tender, and the return date.

Send usa tender

Tell us about the site and what the package covers. We'll come back to you to get the drawings and price it.

  • CoveringMerseyside, Greater Manchester, Lancashire and Cheshire
  • WorkNew-build housing joinery, first to final fix
  • Webrjoycejoinery.com

Tell us about the site

We'll get back to you to talk it through.

We only need a phone number or an email, not both.